• T.C 91/1372, Chakkai,TVM

Architectural Design and Structural Engineering, MEP Designing

1)      Architectural design.

2)       Geotechnical aspects in relation to foundation and retention system design.

3)      Structural Designing, economics and constructability of detailing.

4)      Durability aspects of all structures exposed to weather.

5)      Alternative framing scheme suggested if concept appears Inefficient or costly.

6)      Selection of concrete strength in terms of durability and cost.

7)      Help in setting an engineering lab at working site, within the project facilities.

8)      Overall ease and speed of construction with recommendations for minimizing vertical concrete elements that are not structurally justified. Vertical concrete elements are generally on critical paths and are slow to construct.

MEP

1)           Air-conditioning

2)           Electrical and communications

3)           Fire Services

4)           Sanitary Systems

5)           Sewage Treatment Plant

6)           Lifts

7)           Building Security Systems

 

 


Warning: Undefined variable $icon in /home/rivt/conceptsengineers.com/wp-content/themes/twentytwentyone/single-service_post.php on line 59

Warning: Undefined variable $icon in /home/rivt/conceptsengineers.com/wp-content/themes/twentytwentyone/single-service_post.php on line 59

Warning: Undefined variable $icon in /home/rivt/conceptsengineers.com/wp-content/themes/twentytwentyone/single-service_post.php on line 59

Architectural Design and Structural Engineering, MEP Designing

1)      Architectural design. 2)       Geotechnical aspects in relation to foundation and retention system design. 3)      Structural Designing, economics and constructability of detailing. 4)      Durability aspects of all structures exposed to weather. 5)      Alternative framing scheme suggested if concept appears Inefficient or costly. 6)      Selection of concrete strength in terms of durability and cost. 7)      Help in setting an engineering lab at working site, within the project facilities. 8)      Overall ease and speed of construction with recommendations for minimizing vertical concrete elements that are not structurally justified. Vertical concrete elements are generally on critical paths and are slow to construct. MEP 1)           Air-conditioning 2)           Electrical and communications 3)           Fire Services 4)           Sanitary Systems 5)           Sewage Treatment Plant 6)           Lifts 7)           Building Security Systems    

-->